![]() The Akruli Kandivli flooding spot, too, has been treated.Ĭitizens will get relief from waterlogging in many areas, including the Andheri subway, said P Velrasu, additional municipal commissioner. ![]() ![]() BMC has also increased the width of the nullah at Andheri Cargo, Sahara Goan from 5 metres to 8 metres. The width of the existing box drain at Santacruz station west was increased from 1.5 metres to 3 metres. It is directed by Josh Cooley (in his feature directorial debut) from a screenplay by Andrew Stanton (who had co. It is the fifth installment in Pixar's Toy Story series and the sequel to 2019's Toy Story 4. In Malad, Patkar wadi, BMC constructed a new stormwater drain and also widened the old drain from 600 millimetres to 1,200 millimetres. Toy Story 5 is an upcoming 2025 American computer-animated comedy film produced by Pixar Animation Studios for Walt Disney Pictures. At Goregaon Squatter Colony, BMC has increased the capacity of the stormwater drain by widening it from 600 millimetres to 1,500 millimetres. Meanwhile, BMC claims it has tackled four chronic flooding spots in the western suburbs. According to data, some of the flood-prone areas in question are: Sahitya Sahwas (Kalanagar), Chandanwadi Nala (Bandra), Air India Road (Santacruz), Bhabha Hospital (Bandra), Jogeshwari Expressway, Khar Expressway, Teachers Colony (Andheri), Motilal Nagar (Goregaon), Nancy Colony, Shimpoli (Borivli). This will help rainwater recede faster during heavy rain,” said the official. “To give citizens more relief, we are installing dewatering pumps in flood-prone areas. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |